ArcGIS REST Services Directory Login
JSON

Legend (MISC/Street_Maintenance)

One Source - Project Status (2)
Selected Location Selected Location
Active Active
Deferred Deferred
Completed Completed
Dropped Location Dropped Location
One Source - Historical Programs (3)
Dirt Street Updates (0)
2023 2023
2024-2032 2024-2032
2026 OP3 - Crosswalk Improvements (40)
2026 OP3 - Project (42)
Concrete Crack Seal Concrete Crack Seal
Concrete Repair Concrete Repair
Crack Seal Crack Seal
Localized Repair Localized Repair
Microsurfacing Microsurfacing
Preservative Seal Preservative Seal
Supplemental Concrete Repair Supplemental Concrete Repair
Ultrathin Surfacing Ultrathin Surfacing
CCLIP CCLIP
Chip Seal Re-Surfacing Chip Seal Re-Surfacing
2026 OP3 - Status (41)
Active Active
Completed Completed
Deferred Deferred
2025 OP3 - Crosswalk Improvements (39)
2025 OP3 - Project (4)
Concrete Crack Seal Concrete Crack Seal
Concrete Repair Concrete Repair
Crack Seal Crack Seal
Localized Repair Localized Repair
Microsurfacing Microsurfacing
Preservative Seal Preservative Seal
Supplemental Concrete Repair Supplemental Concrete Repair
Ultrathin Surfacing Ultrathin Surfacing
2025 OP3 - Status (1)
Active Active
Completed Completed
Deferred Deferred
2024 OP3 - Crosswalk Improvements (36)
2024 OP3 - Project (37)
Concrete Repair Concrete Repair
Crack Seal Crack Seal
Localized Repair Localized Repair
Microsurfacing Microsurfacing
Preservative Seal; Preservative Seal (2) Preservative Seal; Preservative Seal (2)
Ultrathin Surfacing Ultrathin Surfacing
2024 OP3 - Status (38)
Active Active
Completed Completed
Deferred Deferred
2023 OP3 - Crosswalk Improvements (5)
2023 OP3 - Project (6)
CCLIP CCLIP
Concrete Repair Concrete Repair
Crack Seal Crack Seal
Localized Repair Localized Repair
Microsurfacing Microsurfacing
Preservative Seal Preservative Seal
Ultrathin Surfacing Ultrathin Surfacing
2023 OP3 - Status (7)
Active Active
Completed Completed
Deferred Deferred
2022 OP3 - Crosswalk/Intersection Repair (9)
Crosswalk Crosswalk
Intersection Repair Intersection Repair
2022 OP3 - Project (10)
Concrete Repair Concrete Repair
Crack Seal Crack Seal
Localized Repair Localized Repair
Microsurfacing Microsurfacing
Preservative Seal Preservative Seal
Ultrathin Surfacing Ultrathin Surfacing
2022 OP3 - Status (11)
Active Active
Completed Completed
Deferred Deferred
2021 OP3 - Crosswalk Replacement (13)
2021 OP3 - Project (14)
Concrete Repair Concrete Repair
Crack Seal Crack Seal
Localized Repair Localized Repair
Microsurfacing Microsurfacing
Preservative Seal Preservative Seal
Ultrathin Surfacing Ultrathin Surfacing
2021 OP3 - Status (15)
Active Active
Completed Completed
Deferred Deferred
2020 OP3 - Crosswalk Replacement (17)
2020 OP3 - Project (18)
Concrete Repair Concrete Repair
Crack Seal Crack Seal
Localized Repair Localized Repair
Microsurfacing Microsurfacing
Preservative Seal Preservative Seal
Ultra Thin Surfacing Ultra Thin Surfacing
2020 OP3 - Status (19)
Active Active
Deferred Deferred
Completed Completed
2019 OP3 - Crosswalk Replacement (21)
2019 OP3 - Project (22)
Preservative Seal Preservative Seal
Crack Seal Crack Seal
Concrete Repair Concrete Repair
Micro Surfacing Micro Surfacing
Ultra Thin Surfacing Ultra Thin Surfacing
2019 OP3 - Status (23)
Active Active
Deferred Deferred
Completed Completed
2018 OP3 - Project (25)
Concrete Repair Concrete Repair
Crack Seal Crack Seal
Concrete Repair/Diamond Grinding Concrete Repair/Diamond Grinding
Micro Surfacing Micro Surfacing
Preservative Preservative
Cold Milling/Concrete Repair/Grinding Cold Milling/Concrete Repair/Grinding
2018OP3 - Status (26)
Active Active
Deferred Deferred
Completed Completed
2017-2018 Hyatt Supplemental - Project (31)
2017 Repair and Surface Treatment 2017 Repair and Surface Treatment
2017 Repair and 2018 Surface Treatment 2017 Repair and 2018 Surface Treatment
2018 Repair and Surface Treatment 2018 Repair and Surface Treatment
2017-18 Proactive Pothole Patching 2017-18 Proactive Pothole Patching
Blue, Green and Red projects are Blue, Green and Red projects are
funded from sale of the Hyatt funded from sale of the Hyatt
2017-2018 Hyatt Supplemental - Status (32)
Completed Completed
Ready For Surface Treatment Ready For Surface Treatment
Active Active
2017 OP3 - Project (28)
Concrete Concrete
Crack Seal Crack Seal
Microsurface Microsurface
Preservative Preservative
Thermal Crack Thermal Crack
2017 OP3 - Status (29)
Completed Completed
Deferred Deferred
Active Active
Selected Location Selected Location
2016 OP3 - Project (33)
Pavement Joint & Crack Seal Pavement Joint & Crack Seal
Preservative Seal Preservative Seal
Micro Surfacing Micro Surfacing
Concrete Street Repair Concrete Street Repair
Thermal Crack Repair Thermal Crack Repair
Slurry Seal Over Scrub Seal Slurry Seal Over Scrub Seal
Micro Surfacing over Scrub Seal Micro Surfacing over Scrub Seal
Fiber Reinforced Micro Surfacing Fiber Reinforced Micro Surfacing
Fiber Reinforced Micro Surfacing over Scrub Seal Fiber Reinforced Micro Surfacing over Scrub Seal
2015 OP3 - Project (34)
Pavement Joint & Crack Seal Pavement Joint & Crack Seal
Preservative Seal Preservative Seal
Concrete Street Repair Concrete Street Repair
Thermal Crack Repair Thermal Crack Repair
Slurry Seal Over Scrub Seal Slurry Seal Over Scrub Seal
Micro Surfacing over Scrub Seal Micro Surfacing over Scrub Seal
Fiber Reinforced Micro Surfacing Fiber Reinforced Micro Surfacing
Fiber Reinforced Micro Surfacing over Scrub Seal Fiber Reinforced Micro Surfacing over Scrub Seal